Synlait Powder Tower 1

The Brief

An independent group formed Synlait and a new factory was to be built in Dunsandel, Canterbury.

Ebert Construction was the main contractor to carry out this project.

Industrial Surefloors were contracted by Ebert’s to complete the flooring works on the site.

The Solution

    • Sureshield Flooring
    • Surechem VE Flooring
    • Situclad VE Glass Flake
    • Laminated Wall Cladding System

The Installation

This job was to be completed in the year of 2008.

In total we installed:

  • 2945 m2 of Sureshield Flooring
  • 1062.8m of Coving
  • Situclad VE Glass Flake Laminated wall cladding was applied to the chemical bunds