Synlait Powder Tower 2

The Brief

The decision was to build a second Powder Tower on the same site at Dunsandle.

Ebert Construction was the main contractor to carry out this project.

Industrial Surefloors were contracted by Ebert’s to complete the flooring works on the site.

The Solution

  • Sureshield Flooring
  • Surechem VE Flooring

The Installation

This job was to be completed in the year of 2009.

In total we installed:

  • 2337.5 m2 of Sureshield Flooring
  • 1085.6m of Coving